- Bit, mud, BHA and deductions carry over from the right prior day.
- Progress, NPT and downtime are calculated, never typed twice.
- The time log is capped at 24 hours per day.
File the drilling day once, properly.
Each daily drilling report starts from the right prior day, shows who holds it and for how long, and flags gaps before it is approved.
- Scope
- One rig, one well, one calendar day
- Entry
- Six guided steps; a draft needs only its identity
- Approval
- Eligible approvers, never the submitter; a reason on every return
- Locking
- Read-only once approved; reopen only when authorised
- Outputs
- PDF (A4), IADC-style Excel, period analytics
